The construction and subsequent operation of hydropower plants with the possibility to save the environment is the ecological choice. Production and distribution of organic water energy to households and businesses is made possible thanks to the construction of the power plant and the subsequent installation of the turbines and alternators.

Activity: - advisory and consulting activities, elaboration of expert studies and assessments (MVE, RES) - manufacture of machinery and equipment (MVE) - manufacture of electronic components, electrical equipment and manufacture and repair of electrical machinery, apparatus and electronic equipment operating at low voltage - production of ...

The company Vladimír Pech - pila and power plant Krkavec is engaged in wood production and wood processing. In our assortment you will find construction and joinery lumber, beams, planks, prisms or pallet blanks. We are located in Veselí nad Lužnicí, Tábor district. Sawmill, sawmill production: - wood processing - log cutting - construction ...

Delivery, assembly, service: - heating plants, boiler rooms, exchange stations - creation of software for PLC, visualization - small hydropower plants - water treatment plants - reservoirs - wastewater treatment plants - gas station - reconstruction of technologies of weirs and water works - maintenance of selected electrical ...